2 wire or 4 wire pull stations waterflow devices tamper switches and other normally open contact devices. 10 amps at 125 or 250 vac60 hz 050 amps at 125 vdc 025 amps at 250 vdc 3.
Afdt And Afdth System Sensor
Victaulic tamper switch wiring diagram. Switch and wiring 1. One switch has two 18 mtw wires per terminal which permit. 10 amps at 125 or 250 vac60 zh 050 amps at 125 vdc 025 amps at 250 vdc 3. The supervisory switch contains two single pole double throw pre wired switches. The pdrp 2001 facp has four programmable nac outputs or releasing solenoids and three programmable form c relays. One switch has two 18 insulated wires per terminal which permit complete.
Switches supervise the valve in the closed position. Switches supervise the valve in the open position. 120 vac 60 hz 366 amps 240 vac 50hz 2085 amps pdrp2001e. Switched receptacle outlet wiring diagram depicting the electrical power feeding into an electrical receptacle box and then going to a switch and to another receptacle. Switches supervise the valve in the open position. 10 amps at 125 or 250 vac60 hz 050 amps at 125 vdc 025 amps at 250 vdc 3.
One switch has two 18 insulated wires per terminal which permit complete. Refer to the switch and wiring section. Verify proper valve andswitchfunction. Switch and wiring 1. Outlets are split wired so that the top half of the receptacle is live all of the time and the bottom of the receptacle is controlled by the wall switch. Firelock ball valve series 728 installation wiring and gear operator replacement instructions i 728 i 728 for complete contact information visit.
The above diagram shows a connection between the common terminal yellow s1 and yellow with orange stripe s2 and the normally closed terminal blue s1 and blue with orange stripe s2. The supervisory switch contains two single pole double throw pre wired switches. In this example the indicator light and alarm will stay on until the valve is fully open. The supervisory switch contains two single pole double throw pre wired switches. Cycle the valve fully opened and then fully closed. Switch and wiring 1.
Re wire the gear operator.

















